
Kitchen Remodeling
Full kitchen renovations with cabinetry, countertops, tile, and lighting handled by one crew — plus the trim and finish work that makes it look built-in, not bolted on.
Learn more
Small rooms, zero margin for sloppy work
Tile showers, vanities, and full bathroom rebuilds. Waterproofing done right behind the tile so the beautiful part stays beautiful.
Bathrooms are the least forgiving rooms in a house. Everything is close to eye level, the tile lines are all visible from the doorway, and whatever happens behind the wall determines whether the room lasts fifteen years or five.
We build our showers with a proper waterproofing system, not just a mud pan and hope. Then we lay out the tile so the cuts land where they should — full tiles at the entry, symmetrical courses at the niche, grout lines that carry through from floor to wall.
From a guest bath refresh to a primary suite taken down to the studs, the same crew does the demo, the waterproofing, the tile, and the trim.
Bonded waterproof membrane, sloped pans, and properly sealed corners. The part nobody sees is the part we are most careful about.
We dry-lay and mark the room so cuts fall in the least visible places and patterns line up around niches, curbs, and corners.
Curbless entries, blocking for future grab bars, comfort-height vanities, and better lighting for homeowners planning to stay put.
A typical full bath is two to four weeks. We tell you which days are loud, which days are quiet, and when the water is off.
Serving Omaha, Bellevue, Papillion, La Vista, Gretna, Elkhorn, Bennington, and every community within about a 45-minute drive.
Request a Free Estimate(402) 812-3298Questions
Straight answers, no hedging. Call if yours is not covered here.
Hall baths commonly land in the mid-teens to low twenties. Primary suites with custom tile work and glass typically start in the low thirties. Your estimate spells out exactly what is driving the number.
Related work
Most remodels touch more than one of these. Bundling them into one project is almost always cheaper than doing them a year apart.

Full kitchen renovations with cabinetry, countertops, tile, and lighting handled by one crew — plus the trim and finish work that makes it look built-in, not bolted on.
Learn more
Comprehensive renovations that update the layout, systems, and finishes of an entire house — managed as a single project instead of a dozen disconnected ones.
Learn more
Room additions, primary suites, sunrooms, and second-story expansions built to match the existing home inside and out.
Learn moreFree estimates · No obligation
Tell us what you have in mind. We come look, answer your questions, and put a written estimate in your hands — free, with no obligation.